|
Build Your Online Product Catalogs?
1. Preparation before construction (1) Check whether the gas, compressed air and industrial electricity are normal, whether there is leakage, and whether all valves are completely closed. (2) Check if all kinds of control instruments and vibration motors are working properly. (3) Check whether the raw material has agglomeration. If there is serious agglomeration, it should not be used; if there is a small amount of agglomeration, the agglomerate should be crushed before use, or discarded. (4) The residue of the permanent lining surface of the tundish, residual steel and other debris must be removed. (5) If there is a crack of ¡Ý3mm in the permanent lining of the tundish, it must be repaired first, and the repairing material must be dried before construction. (6) Evenly apply 2~3mm release agent (or waste engine oil + graphite) on the working lining tire. |
Company: |
Sinometal Machinery Corp.
|
Contact: |
Mr. Jack Niu |
Address: |
No.3, Lanfeng Lane, Shahekou District |
Postcode: |
116001 |
Tel: |
041139625877 |
Fax: |
|
E-mail: |
|
|
|
|